Choose the Colorlight X2s when the LED wall’s approved wiring fits its two Gigabit outputs. Consider the X4s when the wall needs three or four independent cable runs, or when the X2s falls short on verified loading. If you are weighing Colorlight X2s vs X4s, start by counting the cables that need to leave the processor. A wall can be comfortably inside the X2s’s total pixel limit and still need the X4s’s extra outputs.
This guide is for an AV integrator pricing a small fixed LED wall from a cabinet drawing. Work through the physical routes, cabinet mapping and source timing before you choose the processor. The example below illustrates a layout decision with hypothetical cabinet dimensions. Use the actual receiving-card model and firmware to confirm the installation.
1. Colorlight X2s vs X4s: Which fits the wall?
その カラーライトX2s has two Gigabit LED outputs and a listed total loading capacity of 1.31 million pixels. The カラーライトX4s has four and a listed total of 2.60 million. Both model-specific V1.3 specifications also describe HDMI and DVI source inputs, scaling and cropping. With either processor, an actual order depends on how you assign cabinet chains to outputs and how the source arrives.

01. Make three checks before choosing
Check total load, each axis and each route independently. Multiply the wall’s active pixel width by its active height for a solid rectangular screen. Separately record the actual cabinet allocations. A design with physically separated sections may need more than one chain even when they all show a single mapped image. On a stepped or irregular wall, use the software and its mapping rules to validate the loads and all occupied positions instead of assuming the bounding rectangle settles the question.
| チェック | X2s | X4s | 購入者が確認する内容 |
|---|---|---|---|
| ギガビットLED出力 | 2 | 4 | Active home runs and any reserved backup outputs fit the model. |
| 記載されている総LED負荷 | 1.31万画素 | 2.60万画素 | The assigned load fits the chosen processor and each port passes its own check. |
| Independent width and height limits | 幅4,096メートル、高さ2,560メートル | 幅4,096メートル、高さ2,560メートル | The actual shape and total fit together. Multiplying the two maxima yields a canvas larger than either listed total. |
| ソース入力 | 1 HDMI, 2 DVI; up to 1920 × 1200 at 60 Hz | 1 HDMI, 2 DVI; up to 1920 × 1200 at 60 Hz | The incoming source uses a supported timing, connection and color format. |
| バックアップ | Single-device or dual-device redundancy listed | Single-device or dual-device redundancy listed | The proposed wiring, assignments and compatible hardware pass a planned interruption test. |
Those figures are from the model-specific V1.3 documents linked on the product listings. The X2s specification PDF is an example of the document to attach to a quotation. Treat the totals as rounded descriptions of the models. To find the usable load on an individual port, confirm the output and receiving-card configuration in the applicable documentation and setup software. A rounded chassis total divided by a socket count gives an estimate, which is too weak a basis for a near-limit order.
02. Separate the data output from the source inputs
Label incoming HDMI and DVI feeds as source connections and the Gigabit runs as LED receiving-card data. The source changes when the operator selects a different input. The receiving-card chains stay on the ports shown in the installation map. The source switch lets the operator choose which device supplies the picture. Use the cabinet routes to count the independent LED home runs.
If the integrator uses a rack patch panel, label each cable end with the processor port and cabinet run. Keep the LED data connections distinct from the building’s general network cabling in the documentation. Record which leads are permanent and which can be moved during an event. This is especially helpful on a shared rack where both sets of cables use familiar RJ45 connectors.

2. Draw the routes before counting outputs
01. Count every chain that starts at the processor
Mark where the processor sits, where each cable crosses into the wall and which cabinet receives it first. In this guide a home run is one cable from a processor output to the first cabinet of a chain. The next cabinet in that chain is linked by the approved cabinet connection. Count the routes that must stay separate because of cable access, structure, service boundaries or redundancy design. The drawing should show the first and last cabinet of every run and the direction of data between them.
Two adjacent rows can sometimes share a chain if the cabinet maker supports the route and there is a safe, maintainable path between them. Where a doorway, sealed compartment or service rule prevents that jumper, assign separate processor ports. Ask the installer who can actually reach the cabinets to review the cable drawings. A line between two positions on a screen map can be easy to draw and hard to install.
Record route length and the connector or patch points on the same drawing. Add enough information for a technician to find the run after the wall is installed. For a cabinet cable that leaves one enclosure and enters another, identify the crossing and its access conditions. Have the system supplier check the cable requirements for the proposed hardware and installation. A relocation that lengthens all of the main runs or changes how cable is supported can force a different equipment decision even if the cabinet dimensions stay the same.

02. Work one layout two ways
Suppose a wall has 12 cabinets with an active resolution of 256 × 256 pixels each. One cabinet is 65,536 pixels. A layout of four cabinets wide and three high measures 1,024 × 768 pixels and totals 786,432 pixels. The pixel total sits below either listed model capacity. The routing still decides whether the X2s is suitable.
In one building, the installer can run two six-cabinet chains through accessible sections. Each chain then carries 393,216 pixels. If the receiving cards, output settings and the chain routes are approved, two physical outputs can be enough. In another building, the upper, middle and lower four-cabinet rows must each return independently to the processor. Each route then carries 262,144 pixels, but there are three first cabinets that need separate processor connections. The X2s’s two ports leave one route without a connection. The X4s is the candidate with enough sockets, subject to the same loading and compatibility checks.
| レイアウトの前提条件 | Pixels by chain | Active outputs | Candidate to validate |
|---|---|---|---|
| Two accessible six-cabinet chains | 393,216 + 393,216 | 2 | X2s or X4s. Confirm each active port’s loading and chain ordering. |
| Three isolated four-cabinet rows | 262,144 per chain | 3 | X4s. Confirm the unused fourth connector’s role in the planned design. |
| Three rows, each with a dedicated paired port required by the design | 262,144 per primary chain | 3 primary and 3 additional paired ports under this assumption | Review a higher-port architecture or another documented backup design. |
These worked examples assume the routes shown. On the actual drawing, add the cabinet ID range, channel assignment and route label for every chain, including the backup if specified. Keep the per-port load with the map. A later change that moves two cabinets from one chain to another can leave the same overall total while altering the load, route and first cabinet at each port.
Plan a physical route for any backup cable that is expected to survive a route failure. Also establish which failures the buyer wants covered. A scheduled test for a single disconnected cable answers a different question from a test for a failed processor or common power feed. Ask for the proposed card and processor combination in writing before treating an unused port as part of the recovery plan.
Keep a spare connection clearly marked in the port schedule once you settle on a processor. For example, if three ports serve the independent rows and port four remains free, record whether it is intentionally unused, reserved for a future cabinet group, or assigned within a supported backup design. Give the same label to the physical port and the cable, if one is installed. During maintenance, an unlabeled fourth connection makes it harder to tell whether a cable was disconnected deliberately.
3. Confirm source timing and the screen map separately
01. Start with a known supported input
Match the source’s output timing to the intended processor input. Both specifications list up to 1920 × 1200 at 60 Hz and supported 8-bit formats. Configure the source to a supported timing, then check that the processor reports the expected signal. Record the active input and settings for the project. A display’s native pixel dimensions can differ from the timing presented by the source, which is why the input check comes before any decisions about output mapping.
Set the crop, scale and output placement deliberately. For the hypothetical 1,024 × 768 wall, decide whether the brief calls for fitting the whole source, filling the screen or showing a particular region. If a test slate contains a title line and four different corner marks, compare their observed positions against the approved fit. When a common video shows only the center, that test makes it easier to detect an unintended crop than working with live content alone.
Ask for one actual source file during commissioning, such as the presentation layout or an image with the organization’s approved title position. Put the four-corner slate through the intended input, then play that file from the same device. Check whether a title, lower-third line or price at the edge fits the planned viewing area. Keep both sources in the record. The slate verifies framing, while the real file checks whether the choice of framing suits the buyer’s material.

02. Diagnose a missing region in the right order
If an entire chain goes blank, use the card map and the route labels to identify the first affected cabinet and which output should feed it. Check the active input and the processor’s local test pattern where supported. If the local pattern fills every position but the live image misses an edge, inspect the source timing, crop and output placement first. If the local test picture fails on the same row, inspect that chain’s output assignment, cabling, receiving-card setup and cabinet power under the installation’s service procedure.
A row that shows the right pattern in the wrong place usually calls for a comparison between the physical chain order and configured positions. A whole source framed incorrectly calls for checking the presentation settings. Record each observation with the test source and settings used. That evidence helps the installer avoid ordering a larger processor to fix what turns out to be a routing or framing mistake.
4. Test the complete route before the operator takes over
01. Label the screen and save a working map
Build a test slate that gives every cabinet a distinct label, puts a visible marker in each corner of the wall and sends moving content across chain boundaries. Under the installer’s approved procedure, check the first and last cabinet on every active output. Verify that the identification marks match their intended positions in both the map and the physical screen. Take a photograph or short clip that shows which version of the test ran.
Save the accepted screen map with the source settings and software version. After a controlled restart, check that all cabinet labels, mapped boundaries and the source’s framing return as specified. Document which settings were read back from the equipment and which are held as project files on the service computer. A future replacement can then be checked against the same map instead of rebuilt from a photograph of a finished picture.
At the same visit, reconcile any differences between the patch panel labels and the software’s output numbers. Photograph the final cable labels and mark the installer’s viewing direction on the map. A left-to-right order from the rear of the wall reads differently from the front. Use a single convention across the screen drawing and cabinet labels. When a cabinet is swapped, require a quick check of its visible position and each neighbor before signing off the route again.

02. Agree what a backup test has to show
When the buyer requires continuity, have the responsible technician document active and backup links before the controlled test. Agree on the failures to simulate and the allowable interruption. Use the labeled test content to show which cabinet groups remain visible, which disappear and whether the normal configuration returns after restoration. An indicator that a link is connected is a useful observation alongside the rendered cabinet pattern. The agreed acceptance criteria should describe what viewers actually see.
Hand over two separate records. One contains the basic equipment list, input and output assignments, path labels and receiver model. The other contains the result for each test, including any constraint that changed the quote. Ask the operator to select the normal source and recover the accepted preset in the presence of the installer. A successful handover includes someone other than the original installer being able to identify the normal state of the system.
For an upcoming extension, place the proposed additional cabinets on a second version of the drawing and date it separately. Recalculate each route’s load and the number of active and reserved outputs. If the added cabinets require their own home run, show where the cable starts and enters the wall. This gives the procurement team a concrete reason to price the four-output model today or hold the extension for a later upgrade.
よくある質問
Can three cabinet rows use only two X2s outputs?
Yes, if a verified chain connects two rows and the resulting per-port load, direction and service access all pass. If each row requires a separate home run, plan three active outputs or redesign the routing.
Does a smaller laptop resolution free an LED output?
The input resolution changes the incoming image. The number of LED outputs is set by the mapped wall and its cables. Check the cabinet chain schedule when deciding how many ports you need.
Can I use the remaining X4s port as backup for all three live routes?
Ask for a supported backup diagram before assigning that port. Document which active route it covers, what hardware is involved and how the design behaves when a planned link fails. One spare socket by itself establishes no coverage.
What information do I need for a replacement X2s or X4s?
Provide the old processor model, hardware revision, software version and receiving-card model, along with the active port map and a known working source timing. Check that the replacement restores the same image in a controlled test.
Are X2s and X2m interchangeable on a quote?
Keep the suffix exactly as printed on the supplied unit. Ask the seller to confirm the required model, connectors, configuration support and revision before treating a similarly named controller as a substitution.
Will an Ethernet switch provide another LED output?
Specify a supported processor-to-receiving-card topology. A switch used for normal network traffic does not turn a two-output processor into a three-output processor. Ask the system supplier to validate the hardware and topology for any proposed distribution arrangement.
Send the port schedule for a quote
If the cabinet map is ready, send LED-Mall the screen dimensions and cable schedule. Include the cabinet pixel size, count per chain, receiver model, processor location and input format. Mark the runs that must remain independent and list any backup requirement as a tested design condition. Request the X2s or X4s configuration that matches the agreed map before the installer pulls cable or the buyer releases the order.


