MX40 Pro optical output carries logical ports 21–40 through OPT 3 and OPT 4 in 40-port mode. In 20-port mode, those sockets copy the first two ten-port groups. Choose the mode before quoting fiber converters or allocating the receiving cards to routes.
NovaStar distinguishes the controller’s 20 physical Ethernet data outputs from the numbered data carried over fiber. A 40-port design can use a different grouping on four optical outputs while the chassis still has 20 Ethernet data sockets. Record the mapping separately from the connector count.
This guide uses NovaStar’s MX40 Pro Specifications and User Manual, both V1.5.1, and identifies any backup example by its separate COEX documentation. It is for the integrator reviewing a bill of materials and screen layout before purchase.
Map the MX40 Pro optical output ports
OPT 1 and OPT 2 keep the same assignments in both modes. The mode changes the role of OPT 3 and OPT 4. Put the selected mode next to the model and firmware on the connection drawing so the production shop and site crew read the same assignments.
| Controller socket | 20-port mode | 40-port mode | What to mark on the drawing |
|---|---|---|---|
| OPTION 1 | Logical ports 1–10 | Logical ports 1–10 | First group and its intended receiving end |
| OPTION 2 | Logical ports 11–20 | Logical ports 11–20 | Second group and its intended receiving end |
| OPTION 3 | Copy of OPT 1 | Logical ports 21–30 | Copy path or third group, depending on mode |
| OPTION 4 | Copy of OPT 2 | Logical ports 31–40 | Copy path or fourth group, depending on mode |
Das Produktseite von LED Mall MX40 Pro describes the copy behavior for the revision cited in its catalog. For a proposed 40-port system, request the configuration screen and the document revision for the quoted unit. A rear photo helps identify the sockets, while the configuration identifies what they carry.

Trace the data from the rack to the cabinets
On a hypothetical expanded wall, the integrator assigns a remote cabinet group to logical port 24. With the MX40 Pro optical output set to 40-port mode, that data belongs to OPT 3. The drawing should then show the converter at the far end, the intended converter Ethernet outlet and the first cabinet it serves. Confirm the converter outlet number on that unit’s own port map.
If the rack instead runs in 20-port mode, OPT 3 repeats the first group. Check the screen layout and mode first if a new branch connected to that socket shows content assigned to the first group. Record the intended role of each branch so the supplier can distinguish an expanded distribution design from a duplicate route.
Physical Ethernet and fiber paths can coexist. For example, logical port 12 is included in the OPT 2 stream. If the layout already delivers that data from the optical path, avoid simultaneously feeding that receiving-card path from controller Ethernet port 12. NovaStar specifies optical precedence if both same-number paths are attached. Identify any intentional backup connection separately in the configuration and test record.

Give every endpoint a unique label. A rack diagram may call two different converter outlets “Port 4” because they sit on different units. Use the local socket label together with the converter identifier and the assigned logical port. Add the cabinet starting point and mark the direction of the path. The resulting schedule should let the installer identify a specific cable with the same reference used on the quotation.
Check what the fiber quote actually includes
Make the MX40 Pro optical output line item traceable to the rest of the bill of materials. List each controller optical socket in use, its transceiver, the far-end converter and optical hardware, the fiber type and length, and the receiving cable and cabinet connection. NovaStar’s V1.5.1 specification says that the controller does not include an optical module by default. Have the supplier state what the quoted package includes at both ends.
The COEX Backup Instruction Manual V1.0.0 shows specific MX40 Pro arrangements using CVT10 or CVT10 Pro converters. Its two-converter 20-port example and four-converter 40-port example are backup designs. Derive your quantity from the selected layout and the failure coverage the project requires. Ask the supplier to specify the exact converter variant and the optics intended to work together.
Keep the MX40 Pro optical output routing plan beside the calculated cabinet loads. The specification gives a device maximum of nine million pixels, and Ethernet data group loads vary with frame rate, bit depth, receiver family and layout. Verify the required format and cabinet allocation before procurement. More numbered groups change how the data can be distributed. Capacity still needs its own check.
On a repeat purchase, ask which software and controller firmware were used to prepare the existing MX40 Pro optical output drawing. If the quoted unit will run a different revision, have the supplier check the corresponding settings and issue a revised schedule before releasing the order. Attach the mode selection and exported or annotated layout to the purchase record to make the approved configuration available at installation.
Define the handover test for the planned routes
Ask the supplier to show the MX40 Pro optical output setting and load a pattern that identifies each destination group. For the hypothetical port 24 group, observe the intended cabinets as the relevant group is identified. Do the same for each group on OPT 4 that the project uses. Record the optical socket, converter outlet, logical port and destination beside the result.
For an engineered backup route, document the intended primary and backup paths and agree on the individual failure demonstrations before a test. Identify the cabinets that must stay available and save the observed recovery result. If a rack is being reused, ask the integrator to inspect the stored receiving-card loop backup settings before changing modes. The V1.5.1 manual calls for removing the receiving-card loop backup setup when returning from a 40-port backup arrangement to 20-port mode.

Keep camera synchronization on a separate acceptance line if required. The MX40 Pro Genlock reference guide covers the timing input, while the output test above confirms the cabinet destination.
Agree on where the acceptance test will take place. A shop test can verify a known optical path and its cabinet assignment, while a venue test can cover installed fiber segments or customer-supplied converters. Record each evidence item as shop-verified, site-verified or pending. Include the actual device identities so the team can repeat a targeted check after a part is changed.
Häufig gestellte Fragen
How can I tell which Ethernet group the LCD is showing?
In 40-port mode, the MX40 Pro User Manual V1.5.1 says that the LCD shows Ethernet connection status in groups of 20. It also shows optical port status separately. Use the configuration and a distinct test pattern to confirm the destination group and its content.
Is a copy on OPT 3 a commissioned backup?
A copy describes the stream sent in 20-port mode. A commissioned backup requires the matched route, appropriate VMP setup and an agreed test. Record whether the requirement covers a fiber path, an Ethernet route or a controller failure, because each needs an appropriate topology.
What should I record if the project reuses a converter?
Record its full model, optical variant and installed modules and the fiber already on site. Request a compatibility check for that exact pair and carry the intended Ethernet outlet assignment into the test. Confirm any spare by model and by the endpoint it would replace.
Request a route and parts check
Send the screen layout, selected mode, controller and receiver versions, output-to-cabinet drawing and proposed far-end optics. Mark any reuse or backup requirements and the demonstration needed for acceptance. Ask LED Mall to review the MX40 Pro optical output plan before finalizing the equipment list.
