Menü - Menu

NovaStar H2 vs H5: Melyik ház illik a LED falhoz?

NovaStar H2 moduláris LED videófal-headelő ház

Choose a NovaStar H2 or H5 by building the input, output and slot schedule for the finished wall. An H2 can be a candidate when the required signal inputs and sending cards fit the 2U chassis. Consider the 5U H5 when the design needs more supported cards or an additional output-card position. In a NovaStar H2 vs H5 comparison, confirm the installed card types, physical slot positions and LED output mode before placing an order.

This guide is for an AV integrator assembling a quote for a fixed LED wall. It separates source input timing, sending-card capacity and cabinet routing, then works through a 10-bit example where the card count changes even though the wall stays the same size. The model and card revisions on the supplier’s quote determine which specification applies.

1. NovaStar H2 vs H5: Start with the cards the job needs

01. Inventory the equipment feeding the wall

Make a row in the source list for every device that must connect. Record its signal type, active resolution, frame rate, color format and bit depth. Add how many such sources must be visible at the same time and which connections will be spare. If an operator expects a camera feed and an on-screen workstation side by side, describe the resulting layer layout as well as the two source ports. That gives the supplier the information needed to check the chosen input card and the processing requirements.

Confirm input timing by the exact card and document. An HDMI label tells you which connector is present. The supported resolutions and modes come from that card’s specifications. Choose test equipment that can reproduce the buyer’s source timing before final acceptance. Store that result in the project record so a later substitution can be checked by more than a model name on a carton.

List a source twice if two distinct feeds must be ready together, even when both originate at one workstation. Give each feed a purpose such as the operator’s full-screen presentation or an image for a separate display region. Conversely, several presentations that all use one approved workstation connection take one physical input in that scenario. Spell out simultaneous use so the number of purchased ports follows the operator’s work.

NovaStar H2 videófal-hegesztővel ellátott ház
Plan the H2 around the specific input and output cards required on site.

02. Identify what each output has to carry

Separate outputs that directly serve LED receiving-card chains from video outputs for preview monitors or other equipment. Give each required output a destination and role. The LED-Mall NovaStar H-Series listing describes a configured bundle with a chassis, one HDMI 2.0 input card and one H_16xRJ45+2xfiber sending card. Check those items against the supplier’s current quotation and specify any extra cards, optical modules or accessories separately.

Three procurement records: source list, installed card and slot list, and LED screen map
Illustrative diagram. Track source timing, installed cards and the LED cabinet map as separate parts of one quote.
Compare the chassis only after listing the required cards
DöntésH2 candidateH5 candidateConfirm in the quote
Rack hely2U alváz5U alvázRack depth, rail or support requirements, cooling and cable access.
Documented published input card maximum410Exact source connector mix, card compatibility, simultaneous layer requirements and supported timing.
Documented published output card maximum23Card type and footprint, permitted output positions and any additional dedicated outputs.
Quoted supplyConfirm chosen chassis and installed cardsConfirm chosen chassis and installed cardsSupplied hardware and firmware revision, exact part codes, required power options, availability and delivery estimate.

Az H2 specifikáció és a H5 specifikáció give the chassis maxima used above. Read those maxima together with the rear-panel drawings and the footprint of every required card. A purchase schedule needs to show a valid position for each installed card. Recheck the exact chassis reference when the seller identifies the supplied revision.

Draw the rack too. Check how the chassis will be supported and where the service team will reach the cards and connectors. A 5U package can satisfy the card count and still require changes to a rack prepared for a shallower or lighter unit. Keep the equipment schedule with the rack elevation so a late output-card change is reviewed against both the physical installation and the signal design.

2. Calculate the load in whole cabinets

01. Start with the sending card and output mode

For H_16xRJ45+2xfiber and H_20xRJ45, the cited specifications list up to 650,000 pixels per RJ45 port in 8-bit mode and up to 320,000 in 10-bit mode. The named cards occupy two physical slots each. Load the project using the documented limit for the actual sending card and output mode. Confirm the intended receiving-card hardware and frame rate with the supplier before sizing a chain near either limit.

The headline card totals describe different configurations. For example, the H_16xRJ45+2xfiber specification lists a 10.4-million-pixel card total. A wall whose pixel count fits that headline may still exceed the available 10-bit capacity of one card because each individual port has a lower limit in that mode. Use the port values for the initial calculation, then confirm the complete allocation, dimensions, mode and card usage in software.

NovaStar H5 modular LED video wall splicer
Check the H5 output slots against the sending card count calculated for the actual mode.

02. Apply the per-port figure to the actual cabinet size

Suppose the wall has 15 cabinets across by eight high, with each cabinet measuring 256 × 256 active pixels. That is 120 cabinets, 65,536 pixels each, and an active wall measuring 3,840 × 2,048 pixels. Its total is 7,864,320 pixels. Assume each cabinet is assigned entirely to one RJ45 chain and that the installation can route the groups required by the calculation.

At the documented 8-bit figure, nine full cabinets use 589,824 pixels. A tenth would bring that chain to 655,360, above 650,000. At the documented 10-bit figure, four cabinets consume 262,144 pixels. A fifth would take the chain to 327,680, above 320,000. Divide the number of cabinets by the maximum whole cabinets per port and round up. Under these assumptions, the initial design calls for at least 14 primary ports at 8 bit and 30 at 10 bit.

120-cabinet example needing at least 14 RJ45 ports at 8 bit or 30 at 10 bit
Illustrative diagram. Whole-cabinet allocation changes the port count with bit depth.
Illustrative 120-cabinet wall, before any backup reservation
LED output modeDocumented limit per RJ45 portTeljes szekrények portonkéntInitial primary-port countCandidate 16-port card count
8 bites650,000 pixels914One H_16xRJ45+2xfiber card on paper.
10 bites320,000 pixels430Two H_16xRJ45+2xfiber cards on paper.

The table sets a lower bound for the planned wiring. A wall built with restricted crossovers or separately serviceable sections can require more ports. Split the screen into physical areas, mark each first cabinet and number destinations in connection order. Recalculate after each assignment. Give every spare or dedicated standby output a named purpose so it can be accounted for on the same schedule.

Dividing the total by the port limit can hide a routing constraint. In the 10-bit case, dividing the pixel total by 320,000 and rounding up gives 25 ports. That calculation treats the total as though it can be divided at any pixel. The whole-cabinet calculation is the starting point for a design where individual cabinets stay together. Use the same principle to check actual cabinet loading and geometry at the edge of each section.

For a mixed cabinet layout, calculate the pixel size of each cabinet or mapped receiver independently. Add those actual loads to each planned route in cable order. A shorter enclosure at the end of a wall may contain a different module count from the standard cabinet. Its effect belongs in the route calculation. Check every group against the applicable port limit and any dimensions or operating constraints in the selected card specification.

3. Put each sending card on a supported slot map

01. Reserve a real position for the second or third card

In the example, two 16-port sending cards provide 32 primary sockets before reservations and use the H2’s two listed output-card positions. A third required output card would force the design team to revisit the chassis or layout. The H5 offers a third published output-card position. Verify the intended combination with the manufacturer’s slot drawing before quoting it, particularly if the extra card serves a different output type or the scheme mixes card families.

Make a schedule with the chassis and each intended part number. For every installed card, show its footprint, physical slot numbers, port role and which screen or device it serves. Ask the seller to identify the chassis or firmware compatibility notes that apply. On a revision to an existing installation, photograph the rear slot markings and record the cards already fitted. That shows whether the new card is an addition, a substitute or part of a larger chassis change.

Keep separate counts for the connectors on one board and the positions it occupies in the chassis. In the example, two of the named 16-port boards have 32 RJ45 sockets and occupy four physical slots. The output-card position count still depends on the documented chassis layout. If the integrator needs a preview output at the same time, add that card to the quote drawing. Check its allowed location and footprint with the supplier alongside the two sending cards.

NovaStar H-Series video wall splicer catalog image
The supplier’s written card and chassis configuration is the reference for the order.

02. Count optical copies once and verify the supply scope

For the named 16-port sending card, its OPT 1 output copies Ethernet ports 1–8 and OPT 2 copies ports 9–16 in the documented arrangement. Include the corresponding optical endpoints and separately ordered modules where applicable. A copied group belongs to the same logical output budget as its Ethernet group. Treat independent optical designs, supported converters and backup topology as separate configuration decisions with their own specification check.

Ask for each power supply and accessory required by the chosen chassis and revision to appear in the quote. If the design needs a redundant power arrangement, name the intended mains feeds and ask the supplier to confirm what is fitted and what it requires. Chassis dimensions, power options and positions for expansion can differ across revisions and models. A photograph of a related chassis can help identify a family, while the supplied hardware record is the reference for an installation.

Keep the quote conditional when a required configuration or part cannot yet be confirmed. The catalog shows the H-Series bundle out of stock at the time of this guide’s check. Availability, supported substitutes, timing and the scope of the installed cards need a current response. If an alternative is proposed, rerun the same source timing, output and cabinet allotment checks against the different hardware.

Documents to approve alongside an H-Series quote
dokumentumPut this on itAmit a rekord megold
Source scheduleFormat, timing, connector, intended layer, and simultaneous use for each feed.Type and quantity of input cards and the formats they must support.
Cabinet and port mapPhysical cabinet group, receiver model, port assignment, calculated load and output depth.Required sending channels and how the wall will be cabled.
Rear slot scheduleEvery card SKU, footprint, proposed position, purpose and version.Whether the combined card set fits the selected chassis.
Supply and acceptance recordInstalled hardware, separately supplied items, exact supported versions, availability and practical test.What the supplier will deliver and how the integrator will accept it.

4. Prove the exact configuration before handover

01. Run the agreed sources and visible cabinet patterns

Ask the integrator to retain the actual card list, slot map and output settings for the test. Bring up each required input at its intended format and timing. In the content layout, check the windows the operator needs to see together. Send a pattern with visible identifiers for every cabinet group and a grayscale or gradient image appropriate to the agreed mode. Confirm the source timing, configured output depth and actual display behavior independently.

A gradient is helpful for comparing an observed picture with the accepted reference, while the configured output mode and reported link status provide separate evidence. Record the actual settings and the observed result together. Check every chain’s first and last cabinet, boundaries between processing regions, and any place where two input layers meet. Keep a labeled photo or commissioning clip with the map.

When source and screen control are handled by different people, identify who will provide the approved source for the test and who will verify the reported sending configuration. Use the planned cables and route labels rather than temporary numbering. If the crew finds an issue on one group, record the actual slot, sender port and first affected cabinet before changing settings. The same record lets the buyer compare the corrected result with the original requirement.

02. Check recovery and prepare the operator’s records

After a controlled restart, verify that the expected source, layers, mapped assignments and agreed output settings return. If backup is in scope, state the fault and acceptance threshold in advance and let the responsible technician run a planned test. Record which group remains visible and what happens after the normal arrangement is restored. Keep the result with the tested hardware and firmware, particularly if the installation relies on a dedicated standby link or spare sending card.

For handover, retain the source formats, board names and slots, front-view cabinet map, physical cable labels, document revisions and agreed recovery steps. Make a separate list of hardware the operator can use as a spare. Have a second installer identify the normal configuration from those materials before accepting the job. An itemized record also makes it easier for the buyer to check that the arriving order matches the sample configuration.

Gyakran Ismételt Kérdések

Does a 10-bit input mean the sending card is operating in 10-bit output mode?

Confirm input format and LED output configuration separately. Use the actual LED sending mode and the specified card limits for the cabinet plan, then record both settings in the acceptance test.

Can two 16-port sending cards fit in an H2?

The H2 specification gives a maximum of two output cards, and the named 16-port sending card occupies two slots. Ask the supplier to approve the actual positions, chassis revision and other required cards before treating the combination as final.

Can I count an optical copy as an extra independent source of LED pixels?

For H_16xRJ45+2xfiber, both optical outputs copy defined Ethernet groups in the documented arrangement. Count each mapped group once. If the design requires independent optical output, verify the appropriate card and its permitted mode.

What if the wall grows after the chassis has been ordered?

Revise the cabinet map and recalculate per-port load and available output positions in the specified mode. Add any new signal inputs or preview feeds to the card list and check the resulting slot map with the supplier.

Does the configured listing cover extra input or sending cards?

Check the current quote line by line. The listing describes a configuration with one HDMI input card and one named sending card. Ask the seller to identify all additional cards, accessories and required power options explicitly.

Can I substitute a similar H-Series chassis if the quoted one is unavailable?

Ask for the exact alternative and its supported card configuration. Recheck input timing, output type, slot fit, cabinet load, firmware and rack requirements. Approve the substitute only after that comparison and an agreed acceptance test.

Request an itemized H-Series quote

Ask LED-Mall for a configuration and availability check. Include the sources and timing, intended LED output mode, cabinet count and pixel dimensions, receiver model, primary and backup port map, and any additional output cards. Ask for the exact chassis, installed card revisions, power accessories and any separately supplied optical hardware in the written quote. Request current availability and estimated supply timing before scheduling installation.